top of page
Arrow Down
Arnett Avenue 15.06.2021_027.jpg
Pinewood School Changing Room Block 
 

This two storey facility comprised changing rooms, showers, drying rooms and locker room, to provide daily sports changing for almost 300 children on a visually sensitive site, sandwiched between a swimming pool and wooded copse.

Design work was carried out by DPDS Consulting resulting in a traditional construction with a reinforced slab, precast concrete first floor and profiled sheet cladding roof. The external envelope was a mixture of face brickwork, render and Siberian larch.

7268052.JPG
7268034.JPG
7268032.JPG
7268009.JPG
7268008.JPG
bottom of page